Order Publications

Reference: WBN027

Type:
Webinars
Title:

Protection and automation issues of islanded systems during system restoration/black start

 

 

Large scale global blackouts of the last two decades highlight certain Protection and Automation responses, which falls directly under the scope of SC B5, having potentially contributed towards delayed restoration and in some cases led to abandonment of intended restoration procedures in favour of slow but sure procedures. There was a need towards investigating Protection and Automation issues during system restoration with focus on network re-energization and resynchronization. This required revisiting CIGRE Technical Brochures that investigated and documented the restoration procedures used both in transmission and distribution networks. This Technical Brochure has integrated three strands of contributions based on the existing body of technical knowledge, Working Group member experiences and curation of technical contributions arising from a survey conducted by this Working Group and 2018 SC B5 Preferential Subject Special Report contributions relevant to this area. 

 

The downloaded document includes on the first page the link to the video, and the complete presentation in PDF format.

 

File Size: 3,3 MB

Pages NB: 39

Study Committee:  B5 ?

WG (TF): WG B5.54

Year: 2021

 
 
 
Download
Member
FREE free
Non member
FREE free
 

Your AccountYour Account

Members

may download free of charge all publications including most recent ones

 

Non Members

may download free of charge publications over three years old and purchase all publications