Session Materials
Extension of a 420/245 kV interconnected transmission network under consideration of uncertain load development and delays concerning the extension of power plants
- This publication is free only for CIGRE members
- Price for non member: 30 €
Extension of a 420/245 kV interconnected transmission network under consideration of uncertain load development and delays concerning the extension of power plants