Summary
This brochure provides a range of important information, which contributes to optimizing the construction cost of AIS substations from the conceptual engineering stage to project close out. A number of case studies are also included in the brochure to show how cost reductions have been achieved in practice by various utilities.
Additional informations
| Publication type | Technical Brochures |
|---|---|
| Reference | 354 |
| Publication year | |
| Publisher | CIGRE |
| Study committees | |
| Working groups | WG B3.15 |
| File size | 3 MB |
| Pages number | 145 |
| Price for non member | 270 € |
| Price for member | Free |