Summary
The work of WG B3.06/ TF-05 aims to fill the gap between data management, through information strategies, and the link with risk-based decision making. The TB establishes general principles for the information strategy (named the 'hourglass model') for substation level asset management; however, the discussed strategy can also be seen in a broader context. Basically, the hourglass model shows that there is a need to link information requirements with data requirements. In order to obtain such a link, it is necessary to have integrated data containing technical, economic, sociological information, and a well-defined enterprise-wide data model.
Additional informations
| Publication type | Technical Brochures | 
|---|---|
| Reference | 576 | 
| Publication year | |
| Publisher | CIGRE | 
| Study committees | |
| Working groups | WG B3.06 | 
| File size | 2 MB | 
| Pages number | 93 | 
| Price for non member | 180 € | 
| Price for member | Free | 
 
		 
    
        
                    