Summary
This paper discusses the safety measures recommended by the authors, including those that have already proven to be useful in the operational practice of the domestic power industry, e.g.:
Read more Read less proper diagnostic program, with approved measurement techniques and timings, focused on identification of any abnormalities at early stage,
on-line monitoring system installation, these covers measurements like DGA, bushings basic parameters as well as PD’s,
OIP type bushings replacement by RIP and RIS type,
non-flammable insulating liquids usability in HV transformers.
Additional informations
| Publication type | Session Materials |
|---|---|
| Reference | A2_11990_2026 |
| Publication year | |
| Publisher | CIGRE |
| Country | Poland |
| Study committees | |
| File size | 619 KB |
| Price for non member | 30 € |
| Price for member | 30 € |
Authors
LECHMAN Maciej - Polskie Sieci Elektroenergetyczne S.A., Poland; WARCZYŃSKI Paweł - TRAFO-SERWIS, Poland