Summary

2014 CIGRE Belgium Conference - Brussels

Table of Contents - Papers

  • 105 - HVDC Bulk Power Line in Germany, Corridor D
  • 101 - Roadmap of the first phase of the European Supergrid
  • 102 - Design of assets of a mixed overhead line – underground cable 400kV link – the STEVIN project
  • 103 - The first Belgian HVDC Link – NEMO – technical choices, obstacles and future developments 
  • 104 - Economic and technical evaluation of AC versus DC transmission depending on the transmission distance
  • 111 - Tuning of Converter Controllers in a VSC-HVDC Grid
  • 112 - Influence of 380 kV AC Underground Cables on the Dynamic Stability of Dutch Transmission System
  • 114 - Optimal Operation of HVDC Links Embedded in an AC Network
  • 115 - Combined AC/DC transmission systems - Benefits and prospects of innovative ultilevel VSC technologies
  • 116 - Challenges relating to EHV AC Extruded Cable Systems to secure High Power Transmission
  • 122 - Optimization Tool for Offshore Wind Connections
  • 123 - Harmonic resonances due to transmission cables
  • 124 - The Atlantic Wind Connection – Building the Foundation for Offshore Wind Energy
  • 125 - Optimisation of substations and theirs transformers to the offshore environment
  • 309 - A cost and performance database of power system technologies in support of the development of the pan-European electricity highways system at the 2050 time frame
  • 321 - Battery Energy Storage for Grid balancing functions

Additional informations

Publication type Colloquia
Reference COLL_BRU_2014
Publication year
Publisher CIGRE National Committee
File size 10 MB
Price for non member Free
Price for member Free
Colloquium - Brussels 2014