Electra
A huge step for the Croatian power system and the European interconnected grid reconstruction of the Ernestinove 400/110 kV substation.
- This publication is free only for CIGRE members
- Price for non member: 20 €
A huge step for the Croatian power system and the European interconnected grid reconstruction of the Ernestinove 400/110 kV substation.