Summary
Faults on high voltage overhead lines are recognised to impose onerous transient recovery voltage (TRV) conditions upon the interrupting circuit-breakers and the Standards test the most critical line fault clearing conditions by means of the short-line fault duties. As recent studies have highlighted potentially more severe TRV conditions when clearing three-phase faults, at a long distance, WG A3.19 was established to assess whether these conditions may be regarded as covered by the existing Standards.
Additional informations
| Publication type | Electra |
|---|---|
| Reference | ELT_248_7 |
| Publication year | |
| Publisher | CIGRE |
| Working groups | WG A3.19 |
| File size | 3 MB |
| Pages number | 6 |
| Price for non member | 20 € |
| Price for member | Free |