Price for non member 30 €
Price for member Free

Authors

M.C. DE ARAUJO, J.H.M. FERNANDES, K.R. DOS SANTOS, H.W.C. DA SILVA, J.L.N. MICHELINI F°, R.G. NOEL, B. DE S. PERRO, P.C.P. SILVA JR., A. QUINTILIANO

Keywords

Session 2016, papers, proceedings, conference, paris

HVDC +800 kV transmission line associated to the Belo Monte hydroelectric power plant - Studies and definitions for the basic design - Innovation and challenges for a new level of voltage in Brazil